34+ years designing, assessing, and delivering fixed offshore platforms, FPSO topside modules, and heavy onshore civil-structure works — from Jakarta to the North Sea, the Caspian, and Brazil's pre-salt fields.
Bobby has spent over three decades in the engineering design and construction of onshore and offshore structures for oil & gas, petrochemical, and industrial facilities — from conceptual design through detailed analysis, reassessment, and construction supervision, across steel, concrete, and geotechnical work.
Beyond core structural work, Bobby has repeatedly stepped into director, project engineer, and construction management roles — building execution plans, controlling budgets, sitting on bidding committees, and coordinating multi-discipline teams across joint ventures and multi-office locations for clients including Kellogg Brown & Root, McDermott, and Kvaerner.
Three disciplines, one continuous thread: taking a structure from concept to constructed, safely and on budget.
Design, calculation, drawing checks, MTO, and construction supervision for new, relocated, or revamped fixed platforms — including in-place, seismic, fatigue, lifting, and transportation analyses.
Design, calculation, structural assessment, repair, and work supervision for office and apartment buildings, and onshore oil & gas facilities.
Area management, execution planning, project and budget controlling, bidding committee participation, project coordination, and construction management.
A newer service layered on top of 34 years of hands-on engineering leadership: helping structural and engineering firms find where AI actually removes friction, risk, and rework from their delivery process.
A structured review of design and delivery workflow to surface inefficiencies, bottlenecks, and manual work that AI can take off a team's plate.
Assessing document control, review cycles, and compliance processes for risk and rework — and where automation reduces both.
A prioritized, practical plan for where and how to introduce AI tools into a firm's existing workflow, without disrupting delivery.
Eight companies, one continuous structural frame — from junior engineer to CEO and senior technical advisor.
Supervises and advises KBR-JEC structural engineers, supporting KBR-Singapore Operation Center on Shell-Crux NNM Topside, Petrobras P-80, and P-84/P-85 FPSO Module projects, plus bid engineering for upcoming work.
Expanded company capability into large-scale onshore and offshore structural engineering and renewable energy (incinerator, waste processing, biomass, RDF), while leading projects and in-house training.
Directed the Indonesian branch of an international group spanning infrastructure, industry, and renewable energy — building out Special Structures, joint ventures, and O&G/petrochemical capability.
Led civil/structural design and construction for the TDAE Plant Project in Batam — a 3.1-hectare plant with jetty and pipeline — while managing tenders, budget, and contractors as deputy construction manager.
Led structural engineering on fixed offshore platforms in 60–80 m water depth across the North Sea and Caspian Sea, plus non-linear seismic assessment of BP Tangguh's Vorwata platform. Technical supervisor for ~60 engineers and designers.
Led structural engineering on offshore projects across Indonesia, Thailand, and Vietnam, and directed major civil works upgrading McDermott's Batam yard — including a 30,000 Mton skidway. Supervised ~50 engineers and designers.
Delivered offshore modification work for Premier Oil, onshore work on Total Indonesie's Tunu-7, and was seconded to Exxon Mobil to upgrade onshore facilities in Lhoksukon, Aceh.
Career start — onshore and offshore design, assessment, and soil investigation work, culminating as construction manager for a two-tower, 15-story apartment complex. Seconded to Maxus-YPF for two years of offshore platform modification.
A cross-section of 60+ projects — spanning FPSO modules, fixed platforms, jetties, and heavy onshore facilities.
Structural advisory for pre- and in-service module analysis, plus focal point for E-House and mechanical package interfacing.
Lead structural engineer performing SACS analysis for pre- and in-service topside, including flare boom design and drawing checks.
Structural Lead for a 14,000 Mton floatover topside across SDB-PR and SDB-QU platforms, covering in-place, blast, jacking, and mating analyses.
Structural Lead for a ~2,500 Mton gas compressor module, 1,500 Mton power generator module, and two bridges spanning up to 123.5 m.
Structural Lead for the WHPE and WHPN platforms — 2,500 Mton topsides, 2,600 Mton jackets, and a 600 Mton connecting bridge. Awarded KBR's MVP Award for this project.
Lead civil/structural design for a 3.1-hectare plant, 10,000 DWT jetty, and 1.5 km pipeline, covering piling, tanks, and steel pipe racks.
Project engineer and lead structure for a 24,000 Mton heavy concrete skidway and new bulkhead at McDermott's fabrication yard.
Structural Lead for non-linear seismic, boat impact, and pushover assessment of two existing 6-legged platforms, benchmarking SACS against CAP.
Graduated in 1991
Recognized for significant contributions to technically challenging design issues on the Arthit and Su Tu Vang Deck Skidways.
Awarded for outstanding achievement as Work Group Leader on the Hess South Arne Jacket Project, including mentoring junior engineers on his own time.
Recognized for dedication and professional work as Head of Discipline, Marine, Civil and Structural.
Full project-by-project record across 34+ years — 78 assignments spanning 8 employers, reproduced in detail from the source CV document.
| Year | Client | Project | Location | Type | Scope | Role |
|---|---|---|---|---|---|---|
| PT. Kellogg Brown and Root IndonesiaSenior Technical Professional Leader | ||||||
| 2024 | Petrobras P-84 & P-85 FPSO Module | Santos Basin Development Project | Central and Northern Pre- Salt Cluster i.e: Atapu-2 & Sepia-2 Brazil | FPSO | EPCI | Lead Structure of KBR-JEC (Jakarta) to support KBR-SOC (Singapore) structural engineering |
| 2023 | Shell-Crux NNM Project | Shell-Crux Development Project | Crux Field Australia | Offshore Platform | EPCI | Lead Structure of KBR-JEC (Jakarta) to support KBR-SOC (Singapore) structural engineering |
| 2023 | Petrobras P-80 FPSO Module | Buzios-9 Oil Field Development Project | Buzios-9 Brazil | FPSO | EPCI | Lead Structure of KBR-JEC (Jakarta) to support KBR-SOC (Singapore) structural engineering |
| PT. Solusi Energy NusantaraPrincipal Civil – Structure Onshore / Offshore | ||||||
| 2022 | PT. Pertamina RU IV Cilacap | Area-70 Jetty-1 Assessment | Cilacap Indonesia | Jetty | E | Civil Structure Lead |
| 2022 | PT Pertamina Gas | Senipah – Balikpapan HDD Pipeline Crossing | Senipah Indonesia | Pipeline | E | Civil Structure Advisor |
| 2022 | Pertamina Gas Negara | KEPMEN 13 : Jetty vs Jettyless Comparison Study | East of Indonesia | Offshore Platform | E | Structure Specialist |
| PT. PCG - Partono Fondas Engineering Consultant - CEO | ||||||
| 2021 | PT. DongJin Indonesia | Chemical Plant Relocation | Cilegon Indonesia | Chemical Plant | E & C | Project Lead |
| 2021 | PT. Bion Sce Indonesia | Refuse-Derived Fuel Burangkeng | Bekasi, Indonesia | Factory | E & C | Project Lead |
| 2020 - 2021 | PT. Semen Tonasa | Raw Mill 411 Foundation Retrofit | Makasar Indonesia | Cement Plant | E & C | Technical Advisor |
| 2020 | Bitzer Compressor Indonesia | Factory Modification | Jakarta Indonesia | Factory | EPC | Technical Director |
| 2019 | PT. Rekayasa Engineering | Jetty Assessment against Furnace Ausmelt Lead Offloading | Muntok Bangka Indonesia | Jetty | E | Technical Director |
| 2019 - 2020 | PT. Sepuluh Sumber Anugerah and Shoenary Javanesia Inc | 17 hectares Shoe Plant | Temanggung Indonesia | Factory | E & C | Technical Director |
| 2018 | PT INC Multi Konsultan / Hyundai E&C | 10,000 MW Biomass Power Plant | South Konawe Indonesia | Renewable | EPCI | Consultant |
| 2018 | PT. Moya Indonesia | IPA 7 WTP 2 X 500 LPS | Tanggerang Indonesia | Water Treatment Plant | E & C | Technical Director |
| PT. Enerco RPO InternationalProject Engineer, Deputy Construction Manager, Lead Civil Structure | ||||||
| 2016 - 2018 | PT. Enerco RPO International | TDAE Plant Project | Batam Indonesia | Onshore Plant | EPCI | Lead / Project Engineer Civil, and Structure, Deputy CM |
| PT. Kellogg Brown and Root IndonesiaSenior Technical Advisor | ||||||
| 2016 | PT. DOK Air Kantung Shipyard | Graving Dock 2 & 3 upgrades | Bangka Indonesia | Graving Dock | E | Professional Civil and Structure Consultant |
| 2015 - 2016 | Maersk Oil UK | Culzean Field Development Project | North Sea Aberdeen UK | Offshore Platform | EPCI | Lead Structure of JEC (Jakarta) to support Lead Structure of SOC (Singapore) |
| 2015 - 2016 | PHE – WMO | Structural Integrated Management system | Jakarta Indonesia | Offshore Platform | E | Structural Specialist |
| 2012 - 2016 | BP Shah Deniz | Shah Deniz Stage 2 Development Project | Caspian Sea Azerbaijan | Offshore Platform | EPCI | Lead Structure of JEC (Jakarta) to support Lead Structure of LOC (London) |
| 2015 | PT Chandra Asri | Assessment on Flare Strcture | Indonesia | Flare Tower | E | Lead Structure |
| 2014 - 2015 | BP Indonesia Tangguh | Assessment on VR-A and VR-B platform | Tangguh Field Indonesia | Offshore Platform | E | Lead Structure of JEC (Jakarta) to support Lead Structure of KBR’s |
| 2012 | PT.PLN Persero | 20kV Voltage Bridge | Indonesia | Onshore | E | Lead Structure and Analyst |
| 2011 - 2012 | Dragados Offshore / HESS Denmark | South Arne Development Project | Denmark | Offshore Platform | EPCI | Lead Structure of JEC (Jakarta) to support Lead Structure of LOC (London) |
| 2011 | Saipem Indonesia / Premier Oil | Gajah Baru Development Project | Indonesia | Offshore Platform | E | Lead Structure and Analyst |
| 2010 | SMOE | Eldfisk Topside Transportation Study | Norway | Offshore Platform | E | Lead Structure of JEC (Jakarta) to support Lead Structure of SOC (Singapore) |
| PT. Mc. Dermott IndonesiaConsulting Engineer A | ||||||
| 2007-2009 | CLJOC | Su Tu Den Northeast WHP-B Field Development | Vietnam | Offshore Platform | EPCI | Lead Structural Engineer |
| 2006-2007 | McDermott Batam | Heavy Skidway & Bulkhead South Yard | Indonesia | Concrete Foundation & Bulkhead | EPCI | Project Engineer / Lead Structural Engineer |
| 2006 | Petronas Carigali Muria Ltd | Kepodang Gas Development | Indonesia | Offshore Platform | E | Lead Structural Engineer |
| 2005-2006 | McDermott Batam | Heavy Skidway West Yard | Indonesia | Concrete Foundation | EPCI | Project Engineer / Lead Structure Engineer |
| 2005 | Cuu Long JOC | Su Tu Vang Field Development | Vietnam | Offshore Platform | EPCI | Senior Structural Engineer |
| 2005 | ConocoPhillips Indonesia | WHP-A Belanak Reanalysis | Indonesia | Offshore Platform | EPCI | Lead Structural Engineer |
| 2004 | McDermott Offshore Operations | Bunga Raya Tripod On Bottom Stability TQA | Malaysia | Offshore Platform | E | Lead Structural Engineer |
| 2003 | McDermott Batam | Berthing Pile, Access Tower and Tower Crane Foundation | Indonesia | Concrete and Steel Foundation | E & C | Lead Structural Engineer |
| 2003 | Total Indonesie | Peciko Pipeline Network Back-up Lines EPSC-4 | Indonesia | Offshore Platform | EPCI | Lead Structural Engineer |
| 2002-2003 | BP West Java Ltd. | ONWJ Gas Projects Group I | Indonesia | Offshore Platform | EPCI | Lead Structural Engineer |
| 2002 | Conoco Phillips | Belanak WHP-B Development Project | Indonesia | Offshore Platform | EPCI | Senior Structural Engineer |
| 2001-2002 | Unocal Thailand | North Pailin Gas Development | Indonesia | Offshore Platform | CI | Senior Structural Engineer |
| PT. Kvaerner IndonesiaSenior Structural Engineer | ||||||
| 2000-2001 | Exxon Mobil | Dehydration and Phase A Separator | Indonesia | Onshore Facility | EPC | Lead Structural Engineer |
| 1999-2000 | Total Indonesie | Tunu 7 Development | Indonesia | Onshore Facility | EPCI | Senior Structural engineer |
| PT. Incontech RhemayasaSenior / Lead Structural Enginee | ||||||
| 1998-1999 | Maxus SES | Maintenance & Development | Indonesia | Offshore Platform | EC | Senior Structural engineer |
| 1997-1998 | PT Megatika Internasional | Permata Executive Apartment | Indonesia | High Rise Building | C | Head of Construction Management |
| 1997 | PT Petronusa Bumibhakti | Rig Zj 45 j foundation | Indonesia | Onshore Drilling | EPCI | Lead Structural Engineer |
| 1997 | PT Merlasakti Abadi | ARII LL Development | Indonesia | Offshore Platform | I | Structural Engineer |
| 1997 | PT Petronusa Bumibhakti | SP-2 Platform | Indonesia | Onshore Drilling | EPCI | Lead Structural Engineer |
| 1996-1997 | PT Reka Patria Ekaguna | ARII LL Development | Indonesia | Offshore Platform | E | Senior Structural Engineer |
| 1996 | PT Truli Abadi | Building Reinforcement | Indonesia | Parking Building | EPC | Lead Structural Engineer |
| 1996 | PT Reka Patria Ekaguna | ARII LL Development | Indonesia | Offshore Platform | E | Senior Structural Engineer |
| 1996 | PT Citrmas Pentama | Flat Building | Indonesia | Building | EPC | Senior Structural Engineer |
| 1995-1996 | PT Pondok Kalimaya Putih | Jetty and Marina | Indonesia | Jetty | EPC | Senior Structural Engineer |
| 1995-1996 | PT Lolamina Jakarta | Cold Storage Building | Indonesia | Building | EPC | Senior Structural Engineer |
| 1995 | PT Paramitha Mardhika | 15 stories twin Apartment | Indonesia | High Rise Building | EPC | Senior Structural Engineer |
| 1995 | Unocal Oil of Indonesia | Attaka Serang Reanalysis | Indonesia | Offshore Platform | E | Senior Structural Engineer |
| 1995 | Unocal Oil of Indonesia | Attaka Serang Reanalysis | Indonesia | Offshore Platform | E | Senior Structural Engineer |
| 1995 | Nisconi | Unocal STA Santan Analysis for Bid Support | Indonesia | Offshore Platform | EPC | Senior Structural Engineer |
| 1995 | PT Reka Patria Ekaguna | ARII LL Development | Indonesia | Offshore Platform | E | Senior Structural Engineer |
| 1995 | PT Aditya Toa Development | Vibration Measurement and Assessment | Indonesia | High Rise Building | E | Senior Structural Engineer |
| 1995 | PT Dharma Nilaitama | Building Strength Assessment After Fire (Semoga Madju Building) | Indonesia | Building | E | Senior Structural Engineer |
| 1994-1995 | PT Paramitha Mardhika | Kebayoran Regency Sport Club | Indonesia | Building | E | Structural Engineer |
| 1994 | PT Total-LKN-Indisi | Four Season Hotel (Regent) Corbel and Beam Repair | Indonesia | High Rise Building | E | Structural Engineer |
| 1994 | PT Bhaktihutama Wiradya | Building Strength Assessment After Fire | Indonesia | Building | E | Structural Engineer |
| 1994 | PT Arsindo Multi Graha | Palma Furniture Building | Indonesia | Building | E | Structural Engineer |
| 1994 | PT Dharma Nilaitama | Building Strength Assessment after Fire (Manyar Supermarket) | Indonesia | Building | E | Structural Engineer |
| 1994 | PT Lestari Magris | Cold Storage / Process Building | Indonesia | Building | E | Structural Engineer |
| 1994 | PT Reka Patria Ekaguna | ARII ZUK Development | Indonesia | Offshore Platform | E | Structural Engineer |
| 1994 | PT Paranada Ekayasa | ARII Onshore Facility | Indonesia | Onshore Facility | EPC | Structural Engineer |
| 1994 | PT Lolamina Jakarta | Cold Storage Beam and Slab Repair | Indonesia | Building | EPC | Structural Engineer |
| 1994 | PT Lolamina Jakarta | Seafood 3rd Expansion | Indonesia | Building | EPC | Structural Engineer |
| 1994 | PT Trimantra Purindo | 5 and 3 Storeys Office | Indonesia | Building | EPC | Structural Engineer |
| 1994 | PT Bali Permai Perkasa | Bali Hai Resort Beam Repair | Indonesia | Building | EPC | Structural Engineer |
| 1994 | PT Sri Rejeki Rejodadi | Electric and New Energy Museum Truss Dome Roof | Indonesia | Building | EPC | Structural Engineer |
| 1993 | Unocal Oil of Indonesia | Structural Reanalysis of Attaka B, Kerindingan II, Melahin III | Indonesia | Offshore Platform | E | Junior Structural Engineer |
| 1992-1993 | Unocal Oil of Indonesia | Attaka ‘P’ Revamping | Indonesia | Offshore Platform | E | Junior Structural Engineer |
| 1992 | Unocal Oil of Indonesia | Sepinggan ‘H’ Deck Extension | Indonesia | Offshore Platform | E | Junior Structural Engineer |
| 1992 | PT Singgar Mulya | ARII FWB, FNB, FN Platforms | Indonesia | Offshore Platform | E | Junior Structural Engineer |
| 1992 | PT Singgar Mulya | Rajah Single Caisson | Indonesia | Offshore Platform | E | Junior Structural Engineer |
| 1992 | PT Hanurata & Coy | Building Assessment after Fire | Indonesia | Building | E | Junior Structural Engineer |
| 1991-1992 | PT Uni Tri Cipta | Structural Assessment of Senayan Stadium | Indonesia | Building | E | Junior Structural Engineer |
| 1991 | PT Uni Tri Cipta | Swimming Pool Modification of Senayan Stadium | Indonesia | Building | EC | Junior Structural Engineer |